Buyer guide
Detailed guidance for check un 38.3 information against the shipped battery
Use these checkpoints to turn a broad inquiry into a decision that can be checked against the actual product, shipment or order. The examples describe information to exchange; they do not assert that a particular document, service term or variant is available.
How to use this guide in a real procurement workflow
Start with the first three checks: name the battery being shipped; ask for the right evidence; distinguish cells from packs. Write down your current evidence for each, even if the answer is “unknown.” Next, identify the decision owner: the person who will approve a product, document, shipment, payment, service remedy or listing. Ask that person what evidence would be sufficient and when the decision is needed. This turns a web form into a useful starting record for a purchasing or engineering discussion.
Work through the remaining checkpoints before you place an order or present a claim to a customer. A question can move between sales, engineering and logistics, and a correct answer from one team may address only part of the project. Request a written clarification whenever a reply is based on a different model, a draft specification or an unverified assumption. Keep a copy of the original request and any revised files. If the supplier cannot confirm a requirement, record the gap and decide explicitly whether to test, change the design, select another product or postpone the transaction. A complete file is valuable later when a new colleague needs to understand the original choice.
01 · Name the battery being shipped
Capture pack model, cell model where known, nominal voltage, capacity, watt-hours, chemistry and the label photographs.
Set the baseline
A decision begins with a named product and a named purpose. Capture the present configuration, including the version and the person responsible for the decision. Separate the item you have in hand from a catalog example or a proposed replacement. Attach legible evidence where the label or connector is the decisive detail. The team can then answer for an identifiable object rather than a category.
In a written response, check the identity of the object first. If the answer describes a different variant, ask whether it is an alternative and what changes in the project. Record the source of the information and the date. A qualification file should explain which item was reviewed, which facts remain provisional and which next action was agreed.
Questions to settle
Which label or source identifies this exact item? Is the photographed unit the same revision offered for purchase? If the inquiry concerns a document, does the named manufacturer and model match the physical product? If it concerns service, can the order be traced to the affected unit? Write the answers in the inquiry so the team does not have to infer them from a marketing title. When an identifier cannot be read, request a clear photograph or an official product record before deciding.
02 · Ask for the right evidence
Request the test summary or report required for the named pack, with manufacturer, report identifier, test date and applicable configuration.
Define intended use
Explain the project, operating environment and intended customer before asking for a recommendation. A school kit, an FPV aircraft and an integrator prototype can require different combinations of support, spares, interfaces and paperwork. Identify the elements you already control and the elements you want the supplier to propose.
Review any recommendation against the original use case. If it solves only one part of the requirement, list the remaining gaps. Ask for the exact configuration on which an answer depends. Preserve this comparison alongside the accepted offer so the final order is not silently expanded beyond the reviewed application.
A realistic scenario
Imagine that a buyer is preparing a request for a mixed shipment that will be sold or used in more than one setting. The product choice may fit one setting while creating extra training, spares, installation or documentation work in the other. Split those uses into separate lines and ask for an answer for each. This helps the buyer compare total project effort rather than treating an individual component price as the whole decision. It also makes exclusions visible before an order is placed.
03 · Distinguish cells from packs
Evidence for a cell does not automatically describe an assembled pack. Ask whether the offered assembly is covered.
Gather identifiers
Where possible, include model, revision, lot, serial, manufacturer and the date of the relevant order or document. Photographs of both sides of a board or battery label can resolve names that a text description cannot. Avoid uploading credentials or confidential design files through an unapproved route.
Compare every identifier in the reply to the physical goods and purchase records. Mark any mismatch for investigation before ordering, shipping or publishing a claim. The presence of a similar model number does not establish that its firmware, cell, connector or test scope is identical.
Common source of confusion
Two items may share a product family name while their labels, board revisions or accessories differ. A buyer who quotes a family name without a photograph can receive a technically accurate answer about the wrong variant. Attach both the supplier listing and the identity of the physical item when they differ. If a discrepancy is found, ask for a corrected written identification rather than silently substituting a file. Record the agreed name in purchasing and support systems.
04 · Match a revision to the order
Check changes in cells, wiring, protection electronics, enclosure and rated capacity against the report scope.
Map interfaces
An item may meet a headline specification while failing at an electrical, mechanical or software boundary. Give relevant voltage, signal protocol, pinout, mounting dimensions, firmware and mating-part references. If you cannot supply a measurement, flag the unknown and ask how it should be verified safely.
A useful answer identifies the applicable interface and its limits. Ask whether the information is derived from a drawing, datasheet, sample or bench test. Keep the revision of the source document; a later design change could invalidate an assumption. Record the result in the BOM or integration checklist.
A practical review step
Draw a small connection or workflow map showing the item and the surrounding parts. Mark each interface that must be checked. On an electronics project this could be power, signal, mounting and firmware; on a document request it could be the relationship between the product label, report scope and shipment paperwork. This exercise often reveals a missing assumption before samples or freight are booked. If an interface falls outside the supplier’s confirmed scope, assign it for independent verification.
05 · Describe the transport configuration
State whether batteries are shipped separately, packed with a drone or contained in equipment and identify the carrier and destination.
State quantity and timing
Separate immediate evaluation units from a pilot order and a possible repeat volume. Provide the destination and the date on which the decision must be made. An estimate should be labelled as such, because available stock and a production forecast are different commitments.
Read the response for quantity breaks, exclusions, lead-time assumptions and the point at which a reservation becomes binding. Do not infer a service level from an example. If timing affects a class, launch or carrier booking, request the relevant milestone in the written order.
Decision checkpoint
A target date can represent several different things: an engineering evaluation, an internal approval, a shipment booking or a customer delivery. State which one matters and how much review time is needed afterward. If a sample is only the first stage, show the estimated quantities for the later pilot separately. This allows a quotation to distinguish an immediate request from a planning forecast. Revisit the schedule when specifications change; a previously discussed date is not automatically valid for a new configuration.
06 · Coordinate with the freight provider
Ask the carrier what evidence, packaging, labels and declarations are required for the actual route and shipment.
Identify required evidence
List the drawings, specifications, safety data, transport records, test summaries, photographs or order documents needed for this specific decision. Ask which file exists, which model it covers, whether it may be shared and whether a reviewer needs an unredacted version.
Compare the file title, issuing party, revision and model with the offered item. A component document may answer a component question but not a finished aircraft approval question. Where the right file is absent, record that as an open qualification issue and choose a responsible owner.
What a complete record contains
For each required file, note the exact question it is meant to answer, the model and revision it refers to, its issue date and the party that issued it. A file may be genuine yet irrelevant to the current unit. Keep a list of unavailable documents rather than quietly replacing them with a generic certificate. A buyer preparing a tender should review the scope of every attached file before copying a claim into the final submission. This is especially important for battery transport and radio-market questions.
07 · Handle a missing report
Record the gap, ask for model-specific evidence and do not infer qualification from a report for another SKU.
Plan evaluation
Describe a small, safe evaluation with conditions and acceptance criteria before requesting material. Identify who will run it, what equipment will be used and how results will be recorded. Distinguish a visual check from an electrical or functional test.
A later answer should say what was observed and under which conditions. Do not generalize one successful setup to every battery, firmware or aircraft. If a failure occurs, retain the sample and describe the sequence rather than changing several variables at once.
Evidence from a trial
A useful trial record includes the test objective, item label, equipment, conditions, procedure and the observations that support the conclusion. Photograph setup details that are difficult to describe, but avoid presenting a photograph alone as a test report. If an issue occurs, capture the first failure and any conditions that reproduce it. One result can support a decision for that tested setup; it cannot establish a universal performance claim. Share the record with the person responsible for the next purchase stage.
08 · Create an evidence trail
Keep the report identifier, pack label, purchase order and seller response together for importer and carrier review.
Control changes
Use a dated revision for a BOM, quotation, drawing or service case. Highlight what changed since the preceding version: quantity, connector, firmware, artwork, cell, destination or delivery term. Tell every reviewer which version is current.
Request explicit acceptance of material changes and record the impact on price, compatibility, documents and timing. A revised file is not approval by itself. The final order should reference the same configuration that engineering, purchasing and shipping have reviewed.
Version discipline
Keep the previous approved file and the proposed replacement side by side. A change log should identify the altered lines and why they changed, rather than merely naming a new date. Ask whether any supplier answer, sample evaluation, price or document depended on a changed field. If it did, ask for an updated response. This matters even when the visible product looks the same: a cell, connector, firmware or packaging change can affect a later step in the chain.
09 · Review changes before repeat orders
A later battery revision can change the scope. Recheck the documents before copying last season’s shipping packet.
Allocate responsibilities
Clarify who will source a part, test the assembly, obtain a carrier decision, prepare a local declaration or handle a customer case. A supplier response may provide inputs while the importer, integrator or buyer retains another obligation.
Write down the owner of each unresolved issue and the evidence needed to close it. A general reply that a topic is being handled is less useful than a defined action, document and review date. If a regulated decision is involved, obtain advice from the appropriate qualified specialist.
Routing to the right owner
A complex question may cross sales, engineering, quality, logistics and the buyer’s own compliance function. Send one summary that identifies the decision owner and separate the questions by responsibility. For example, commercial staff can confirm a written offer, while a carrier determines a route-specific shipping requirement. Make the handoff explicit and keep a record of the source of each answer. Do not treat a helpful informal message as a substitute for the document or agreement a later stakeholder needs.
10 · Separate SDS from testing
An SDS explains safety information. A UN 38.3 summary relates to a defined test regime. Ask for each by name.
Confirm the outcome
Return to the original decision and check whether it has actually been answered. Summarize the chosen model, the quantities, the accepted revision and the conditions still attached. If the scope changed, update the request instead of treating an older answer as current.
Keep the final reply with the order, engineering change or service record. Include who approved it and what will trigger a new review. This creates a usable history for repeat procurement and prevents a later team member from mistaking an exploratory discussion for a verified product claim.
Close-out checklist
Before closing the thread, verify that the proposed product, document or remedy matches the opening request. Record the accepted variant, remaining tests, quantities, destination and person responsible for the next step. If there is still an open point, leave the case open with a clear action rather than marking it resolved. When repeat orders or later support cases arise, this closing record explains which assumptions were actually checked and which were only discussed. Update it after an approved change.